Project Report - Ontario Office
Charlie Jenks, Office Manager (Toronto)

We are very fortunate at Dowco to still be relatively busy in this difficult time. The projects that we are working on include;
RDK8 (Alstom) – Our portion of this large boiler project is coming to an end. Other than a few revisions and some outstanding RFI's this should be wrapped up by early August. Eva Pohoriljakova's crew has worked hard to maintain a fast paced schedule and all the while maintain a quality product. Good job everyone.
World Trade Center (DCM Erectors) – The detailing for Area 3 (21st to 40th Floors) is now complete. We are presently issuing returned approvals to the shop. Area 6 (81st to 100th Floors) connections are coming in and Orly Gaspar's team is moving up the structure as the information becomes available.
World Trade Center Antenna (DCM Erectors) – The majority of the main mast and rings of this project are now detailed pending a number of outstanding questions. The project includes two large HVAC structures for which we are presently awaiting connections. Once this project moves forward with fabrication it will make for some very interesting pictures and hopefully a "Featured Project" in a future details magazine.
National Enrichment Facility (Hirschfeld) – We have just been awarded the next portion of the National Enrichment Facility that Gord Lamb will be running. This is an expansion of a structure that we have been working on for some time. A fast paced schedule will be a challenge but with Hirschfeld's great PM team I'm sure it will be maintained.
I would like to congratulate our individual performance winners; Joey Caranto, Fang (Jason) Yuan, Joselito Caranto and Steve Tesic.
Good Work Everyone!