Project Report - Surrey / Langley Office
John Meldrum, Office Manager (Surrey)

Alstom – RDK8 Project
With Tiers 1 and 2 completed, we have turned our attention to Fast Track changes. These changes are quite extensive, and will possibly affect most of the structure, which will be released by level as they are completed by the Alstom team.
Tiers 3 through 6 are close to completion, most of which was detailed in our sister offices. This office also assisted by detailing the Main Boiler Structure interior platform steel for these tiers. As of this writing, Dowco has issued over 18,000 shop drawings on the project, plus an innumerable array of fitting sheets, etc., etc.
Thanks to the Alstom RDK8 team for all their help.
Staff Awards
Congratulations to Jocelyn Lu, Larry Shiskin and Gino Ocampo for their Individual Performance Awards for their contribution to the project.
Alberto Guandique has requested a temporary transfer to our Laval office until February 2010. Goodluck Alberto!