Project Report: Surrey/Langley
John Meldrum, Office Manager (Surrey)
Tulsa Event Center
From the pictures we have received from our Schuff team, the roof is complete and outer skin is being installed along with the glass walls.
Genentech Building 50
This structure seems to be in a constant state of flux. We have completed the detailing for the main structure as far as we can go, but many outstanding issues remain before we can finalize.
Berlin N.H. Federal Correctional Institute
This report should see the completion of our detailing efforts on this project. We wish to thank the Isaacson team for using Dowco as their detailer.
Maritza East 1 Power Station – Unit 2
We are continuing with our assistance to our Burnaby office on the 22.5 and 26.5 Metre levels. With the constant changes to the model, the structure has become quite a challenge for both offices. Our main Alstom contact, Mr. Thomas Hirsch is an encyclopedia of information.
Three of our Langley staff (Alberto, Michael, and Matthew) have been assisting Alstom directly in their offices in Stuttgart, Germany. We wish to thank Alstom and Thomas for their kindness and looking after our staff during their tenure.